Now that the Ditch Witch work is complete, there is quite a bit of hand work still to be done on the footers. Cleanout of the remaining loose dirt, redistribution of all the augured dirt on the pad and cutting a 45 degree bevel on the inside top of each edge of the footer require some sweat.
Here is a drawing to illustrate the footer/slab plan:
Footer/Slab Details
Photos of non-cleaned out section of the footer:
Lots of pickaxing still required…
No beveled edge yet.
Photos of cleaned-out sections follow. Note the 45 degree bevel on the [...]